Project Overview – Designed to fulfil our clients request for a foundationless, rapidly erected building, fully demountable and relocated on completion of its five year requirement. This unique and innovative building system has been developed by Suitebox and ES Global utilising standard construction materials and components adapted and developed to suit the requirement of reuse. This allows us to erected buildings with a design life from 6 months to anything up to 60 years.

Using ground-breaking manufacturing design and installation techniques this type of relocatable building is a viable and real alternative to traditionally constructed building

ES Global’s Role – ES Global was employed on a design and build basis

Project Title – Chobham Manor
Client – Octink and Taylor Wimpey
Designer – Octink
Location – Olympic Park, London, UK
Project Duration – 26 weeks
Floor Area – 820m2
Build Period – 14 weeks
Dismantling Period – 4 days